Factory / Bakery
Delice Pan
Combined setup for the bakery factory and neighboring homes, with a wood-chip boiler, buffer tank, and solar thermal contribution.
Compatible equipment
Equipment used in this project
Key indicators
- 1 x 120 kW wood-chip boiler
- Puffer 3000 L
- 20 m2 solar thermal field
- Heated area ~1300 m2 (factory 800 m2 + 3 neighboring houses 500 m2)
Technical configuration
- 1 x 120 kW wood-chip boiler
- 3000 L buffer tank and 20 m2 solar thermal field
- Factory / bakery: ~800 m2
- 3 neighboring houses: ~500 m2
Project gallery
Similar projects
Other projects in portfolio

Guesthouse
At home in Bucovina
Bucovina · 120 kW
Compact system on the chopping block for tourist guesthouses, with a dedicated buffer for thermal stability in operation.

Hotel
Hotel Ivascu
Moisei · 660 kW
Industrial cascade installation for a hotel with a large area, SPA area and high autonomy requirements.

Hotel
Hotel Panoramic
Colibita · 240 kW
High power configuration, designed for hotel, outdoor swimming pool and thermal distribution to neighboring spaces.
